# 3TS10 SESVETE

Substation SESVETE: no capacity, 0 MW free. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: no capacity · Free capacity: 0 MW

## Figures

- **Category, existing network**: no capacity
- **Category, with upgraded 110/x kV transformer**: no capacity
- **Free capacity**: 0 MW
- **Added by the upgrade**: 0 MW
- **Existing users**: 0 MW
- **Lowest daily consumption**: 0 MW
- **Voltage ratio**: 30/10 kV
- **Distribution area**: Elektra Zagreb
- **Fed by**: [TS 110/30kV 4TS 30 RESNIK](https://gridatlas.eu/en/grid-capacity/ts-110-30kv-4ts-30-resnik/)
- **Location**: 45.82345, 16.12373

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | no capacity | 0 MW |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=45.8234%2C16.1237%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/3ts10-sesvete/
- Data from 13 November 2026
- Data: ODbL, CC BY and partly CC BY-NC, with attribution; downloads as a whole are non-commercial. Code: MIT.
- How to cite (APA): GridAtlas. (2026, November 13). 3TS10 SESVETE [Data set]. https://gridatlas.eu/en/grid-capacity/3ts10-sesvete/