# TS 110/35/10kV KOMOLAC

Substation KOMOLAC: D: more than 20 MW, 80 MW free. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: D: more than 20 MW · Free capacity: 80 MW

## Figures

- **Category, existing network**: D: more than 20 MW
- **Category, with upgraded 110/x kV transformer**: D: more than 20 MW
- **Free capacity**: 80 MW
- **Added by the upgrade**: 0 MW
- **Existing users**: 0.6 MW
- **Users with a contract**: 0.9 MW
- **Requests in progress**: 0.2 MW
- **Total connection capacity**: 1.7 MW
- **Lowest daily consumption**: 19 MW
- **Transformers (MVA)**: 63 + 63
- **Planned transformers (MVA)**: 63 + 63
- **Voltage ratio**: 110/35/10(20) kV
- **Distribution area**: Elektrojug
- **Location**: 42.66997, 18.13581
- **On the map**: [TS Komolac](https://gridatlas.eu/en/?sel=osm%3Away%2F149975110&v=42.6697%2C18.1359%2C12)

## Substations it feeds

| Substation | Existing network | Free |
| --- | --- | --- |
| [TS 35/10kV LAPAD](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-lapad/) | C: up to 20 MW | 16 MW |
| [TS 35/10kV ORAŠAC](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-orasac/) | A: up to 5 MW | 3.5 MW |
| [TS 35/10kV ŠIPČINE](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-sipcine/) | C: up to 20 MW | 16 MW |

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | D: more than 20 MW | 80 MW |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=42.6700%2C18.1358%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/ts-110-35-10kv-komolac/
- Data from 13 November 2026
- Data: ODbL, CC BY and partly CC BY-NC, with attribution; downloads as a whole are non-commercial. Code: MIT.
- How to cite (APA): GridAtlas. (2026, November 13). TS 110/35/10kV KOMOLAC [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35-10kv-komolac/