# TS 110/35/10kV KRIŽEVCI

Substation KRIŽEVCI: B: up to 10 MW, 5.7 MW free. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: B: up to 10 MW · Free capacity: 5.7 MW

## Figures

- **Category, existing network**: B: up to 10 MW
- **Category, with upgraded 110/x kV transformer**: D: more than 20 MW
- **Free capacity**: 5.7 MW
- **Added by the upgrade**: 20 MW
- **Existing users**: 8.3 MW
- **Users with a contract**: 6 MW
- **Requests in progress**: 3.7 MW
- **Total connection capacity**: 18 MW
- **Lowest daily consumption**: 3.6 MW
- **Transformers (MVA)**: 20 + 40
- **Planned transformers (MVA)**: 40 + 40
- **Voltage ratio**: 110/35/10 kV
- **Distribution area**: Elektra Bjelovar
- **Location**: 46.01641, 16.52587
- **On the map**: [TS Križevci](https://gridatlas.eu/en/?sel=osm%3Away%2F171154391&v=46.0159%2C16.5263%2C12)

## Substations it feeds

| Substation | Existing network | Free |
| --- | --- | --- |
| [TS 35/10kV APATOVAC](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-apatovac/) | A: up to 5 MW | 3.6 MW |
| [TS 35/10kV KRIŽEVCI 1](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-krizevci-1/) | B: up to 10 MW | 5.7 MW |
| [TS 35/20/10kV OREHOVEC](https://gridatlas.eu/en/grid-capacity/ts-35-20-10kv-orehovec/) | A: up to 5 MW | 0.4 MW |
| [TS 35/20/10kV TKALEC](https://gridatlas.eu/en/grid-capacity/ts-35-20-10kv-tkalec/) | no capacity | 0 MW |

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | B: up to 10 MW | 5.7 MW |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=46.0164%2C16.5259%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/ts-110-35-10kv-krizevci/
- Data from 13 November 2026
- Data: ODbL, CC BY and partly CC BY-NC, with attribution; downloads as a whole are non-commercial. Code: MIT.
- How to cite (APA): GridAtlas. (2026, November 13). TS 110/35/10kV KRIŽEVCI [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35-10kv-krizevci/