# TS 110/35/20/10kV NAŠICE

Substation NAŠICE: no capacity. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: no capacity

## Figures

- **Category, existing network**: no capacity
- **Category, with upgraded 110/x kV transformer**: no capacity
- **Existing users**: 12 MW
- **Users with a contract**: 34 MW
- **Requests in progress**: 3.3 MW
- **Total connection capacity**: 50 MW
- **Lowest daily consumption**: 7.9 MW
- **Transformers (MVA)**: 40 + 40
- **Planned transformers (MVA)**: 40 + 40
- **Voltage ratio**: 110/35/10 kV
- **Distribution area**: Elektroslavonija Osijek
- **Location**: 45.50993, 18.09395
- **On the map**: [TS Našice](https://gridatlas.eu/en/?sel=osm%3Away%2F235546323&v=45.5094%2C18.0936%2C12)

## Substations it feeds

| Substation | Existing network | Free |
| --- | --- | --- |
| [TS 35/20/10kV BUDIMCI](https://gridatlas.eu/en/grid-capacity/ts-35-20-10kv-budimci/) | no capacity | 0 MW |
| [TS 35/10kV INA BOKŠIĆ](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-ina-boksic/) | no capacity | 0 MW |
| [TS 35/10kV ORAHOVICA](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-orahovica/) | no capacity | 0 MW |

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | no capacity |  |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=45.5099%2C18.0939%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/ts-110-35-20-10kv-nasice/
- Data from 13 November 2026
- Data: ODbL, CC BY and partly CC BY-NC, with attribution; downloads as a whole are non-commercial. Code: MIT.
- How to cite (APA): GridAtlas. (2026, November 13). TS 110/35/20/10kV NAŠICE [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35-20-10kv-nasice/