# TS 110/35kV NEREŽIŠĆA

Substation NEREŽIŠĆA: B: up to 10 MW, 9.9 MW free. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: B: up to 10 MW · Free capacity: 9.9 MW

## Figures

- **Category, existing network**: B: up to 10 MW
- **Category, with upgraded 110/x kV transformer**: B: up to 10 MW
- **Free capacity**: 9.9 MW
- **Added by the upgrade**: 0 MW
- **Existing users**: 20 MW
- **Users with a contract**: 16 MW
- **Requests in progress**: 1 MW
- **Total connection capacity**: 38 MW
- **Lowest daily consumption**: 7.5 MW
- **Transformers (MVA)**: 40 + 40
- **Planned transformers (MVA)**: 40 + 40
- **Voltage ratio**: 110/35 kV
- **Distribution area**: Elektrodalmacija Split
- **Location**: 43.33570, 16.59159
- **On the map**: [TS Nerežišća](https://gridatlas.eu/en/?sel=osm%3Away%2F149973193&v=43.3357%2C16.5915%2C12)

## Substations it feeds

| Substation | Existing network | Free |
| --- | --- | --- |
| [TS 35/10kV BOL](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-bol/) | B: up to 10 MW | 7.7 MW |
| [TS 35/10kV MILNA](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-milna/) | no capacity | 0 MW |
| [TS 35/10kV POSTIRA](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-postira/) | A: up to 5 MW | 4.3 MW |
| [TS 35/10kV PUČIŠĆA](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-pucisca/) | A: up to 5 MW | 3.5 MW |

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | B: up to 10 MW | 9.9 MW |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=43.3357%2C16.5916%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/ts-110-35kv-nerezisca/
- Data from 13 November 2026