# TS 110/35kV SINJ

Substation SINJ: C: up to 20 MW, 13 MW free. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: C: up to 20 MW · Free capacity: 13 MW

## Figures

- **Category, existing network**: C: up to 20 MW
- **Category, with upgraded 110/x kV transformer**: C: up to 20 MW
- **Free capacity**: 13 MW
- **Added by the upgrade**: 0 MW
- **Existing users**: 5.7 MW
- **Users with a contract**: 33 MW
- **Requests in progress**: 0.6 MW
- **Total connection capacity**: 39 MW
- **Lowest daily consumption**: 12 MW
- **Transformers (MVA)**: 40 + 40
- **Planned transformers (MVA)**: 40 + 40
- **Voltage ratio**: 110/35 kV
- **Distribution area**: Elektrodalmacija Split
- **Location**: 43.70033, 16.62622
- **On the map**: [TS Sinj](https://gridatlas.eu/en/?sel=osm%3Away%2F40373769&v=43.7000%2C16.6260%2C12)

## Substations it feeds

| Substation | Existing network | Free |
| --- | --- | --- |
| [TS 35/10kV MUĆ](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-muc/) | A: up to 5 MW | 0.8 MW |
| [TS 35/10kV PRANČEVIĆI](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-prancevici/) | A: up to 5 MW | 2.3 MW |
| [TS 35/10kV RUDA](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-ruda/) | A: up to 5 MW | 3.9 MW |
| [TS 35/10kV SINJ 1](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-sinj-1/) | B: up to 10 MW | 5.1 MW |
| [TS 35/10kV SINJ 2](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-sinj-2/) | B: up to 10 MW | 7.1 MW |
| [TS 35/10kV TRILJ](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-trilj/) | A: up to 5 MW | 3.6 MW |

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | C: up to 20 MW | 13 MW |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=43.7003%2C16.6262%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/ts-110-35kv-sinj/
- Data from 13 November 2026
- Data: ODbL, CC BY and partly CC BY-NC, with attribution; downloads as a whole are non-commercial. Code: MIT.
- How to cite (APA): GridAtlas. (2026, November 13). TS 110/35kV SINJ [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35kv-sinj/