# TS 110/35kV SLAVONSKI BROD 1 - PODVINJE

Substation SLAVONSKI BROD 1 - PODVINJE: no capacity. HEP ODS data on connecting power plants and battery storage, with the history of releases.

Category, existing network: no capacity

## Figures

- **Category, existing network**: no capacity
- **Category, with upgraded 110/x kV transformer**: no capacity
- **Existing users**: 14 MW
- **Users with a contract**: 18 MW
- **Requests in progress**: 28 MW
- **Total connection capacity**: 60 MW
- **Lowest daily consumption**: 12 MW
- **Transformers (MVA)**: 40 + 40
- **Planned transformers (MVA)**: 40 + 40
- **Voltage ratio**: 110/35 kV
- **Distribution area**: Elektra Slavonski Brod
- **Location**: 45.18570, 18.04158
- **On the map**: [TS Slavonski Brod 1](https://gridatlas.eu/en/?sel=osm%3Away%2F125555967&v=45.1862%2C18.0411%2C12)

## Substations it feeds

| Substation | Existing network | Free |
| --- | --- | --- |
| [TS 35/10kV BEBRINA](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-bebrina/) | no capacity | 0 MW |
| [TS 35/10kV BROD I](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-brod-i/) | no capacity | 0 MW |
| [TS 35/10kV BROD II](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-brod-ii/) | no capacity | 0 MW |
| [TS 35/10kV BRODSKO BRDO](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-brodsko-brdo/) | no capacity | 0 MW |
| [TS 35/10kV SIBINJ](https://gridatlas.eu/en/grid-capacity/ts-35-10kv-sibinj/) | no capacity | 0 MW |
| [TS 35/20/10kV TRNJANI](https://gridatlas.eu/en/grid-capacity/ts-35-20-10kv-trnjani/) | no capacity | 0 MW |

## Category across releases

| Release | Existing network | Free |
| --- | --- | --- |
| 1 November 2026 (v6) | no capacity |  |

## Source and disclaimer

- [Show the place on the map](https://gridatlas.eu/en/?v=45.1857%2C18.0416%2C12)
- [Free capacity in the distribution grid (HEP ODS)](https://gridatlas.eu/en/grid-capacity/)

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

- [HEP ODS's map: kapaciteti.hep.hr](https://kapaciteti.hep.hr/)

---

GridAtlas

- Page: https://gridatlas.eu/en/grid-capacity/ts-110-35kv-slavonski-brod-1-podvinje/
- Data from 13 November 2026
- Data: ODbL, CC BY and partly CC BY-NC, with attribution; downloads as a whole are non-commercial. Code: MIT.
- How to cite (APA): GridAtlas. (2026, November 13). TS 110/35kV SLAVONSKI BROD 1 - PODVINJE [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35kv-slavonski-brod-1-podvinje/