# Hidroelektrane u Bosni i Hercegovini

Hidroelektrane u Bosni i Hercegovini na GridAtlasu: popis (ukupno 48, zbroj upisane snage 3,38 GW), položaj i izvori. Otvoreni podaci, tjedno ažurirani.

Ukupno na karti: 48 · zbroj upisane snage (svi statusi): 3,38 GW. Brojke su ono što je upisano u izvorima, pa su donja granica stvarnog stanja.

## Hidroelektrane

| Naziv | Snaga |
| --- | --- |
| [MHE Ivančica](https://gridatlas.eu/objekt/osm-way-1470839891/) | 497 MW |
| [HE Višegrad](https://gridatlas.eu/objekt/osm-relation-11763638/) | 315 MW |
| [Salakovac Hydroelectric Power Station](https://gridatlas.eu/objekt/osm-relation-17646284/) | 210 MW |
| [Jablanica hydroelectric plant](https://gridatlas.eu/objekt/gem-L100000600199-operating/) | 180 MW |
| [Powerhouse HE Jablanica](https://gridatlas.eu/objekt/osm-way-1290371943/) | 180 MW |
| [Trebinje 1 Hydroelectric Power Station](https://gridatlas.eu/objekt/osm-relation-17686264/) | 168 MW |
| [HE Rama mašinska hala](https://gridatlas.eu/objekt/osm-way-753002400/) | 160 MW |
| [HE Rama podzemna centrala](https://gridatlas.eu/objekt/osm-relation-17688669/) | 160 MW |
| [Dabar hydroelectric plant](https://gridatlas.eu/objekt/gem-L100000600196-construction/) | 159 MW |
| [ХЕ Зворник](https://gridatlas.eu/objekt/osm-way-753131894/) | 126 MW |
| [HE Grabovica](https://gridatlas.eu/objekt/osm-way-752999697/) | 117 MW |
| [Buk Bijela hydroelectric plant](https://gridatlas.eu/objekt/gem-L100000600194-planned/) | 115 MW |
| [Grabovica Hydroelectric Power Station](https://gridatlas.eu/objekt/osm-relation-17645418/) | 114 MW |
| [HE Bočac](https://gridatlas.eu/objekt/osm-relation-19665833/) | 110 MW |
| [HE Bočac](https://gridatlas.eu/objekt/osm-way-1434504500/) | 110 MW |
| [HE Mostar](https://gridatlas.eu/objekt/osm-way-752999100/) | 72 MW |
| [Mostar Hydroelectric Power Station](https://gridatlas.eu/objekt/osm-relation-17702517/) | 72 MW |
| [Ustikolina hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001020838-planned/) | 61 MW |
| [HE Mostarsko Blato](https://gridatlas.eu/objekt/osm-way-810581775/) | 60 MW |
| [Jajce I hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001022875-operating/) | 48 MW |
| [Foča hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001081882-planned/) | 45 MW |
| [Paunci hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001081881-planned/) | 43 MW |
| [Mrsovo hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001081878-planned/) | 37 MW |
| [HE Ulog (mali)](https://gridatlas.eu/objekt/osm-way-752676247/) | 35 MW |
| [Bileća hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001081884-planned/) | 34 MW |
| [Hidroelektrana Peć Mlini](https://gridatlas.eu/objekt/osm-way-810337946/) | 31 MW |
| [Jajce II hydroelectric plant](https://gridatlas.eu/objekt/gem-L100001054554-operating/) | 30 MW |
| [Peć Mlini](https://gridatlas.eu/objekt/osm-way-810337971/) | 30 MW |
| [Bogatići SHPP](https://gridatlas.eu/objekt/osm-way-401925372/) | 10 MW |
| [MHE Bočac 2](https://gridatlas.eu/objekt/osm-way-752979637/) | 10 MW |
| MHE Dub | 9,4 MW |
| Hidroelektrana Trebinje II | 8 MW |
| MHE Ustiprača | 6,8 MW |
| MHE Mesići-Nova | 5 MW |
| MHE Jeleč | 4,8 MW |
| MHE Do | 2 MW |
| MHE Kaljani | 1,5 MW |
| MHE Vitez-1 | 1,2 MW |
| MHE Krušnica | 0,5 MW |
| Brana MHE Dub |  |
| Brana MHE Ustiprača |  |
| HE Mesići "Slaviša Vajner Čiča" |  |
| Hidroelektrana |  |
| MHE Bistrica B-5A |  |
| MHE Kruševo Brdo |  |
| MHE Lašva |  |
| MHE Lašva Merdani |  |
| MHE Podvič |  |

## Karta

- [Otvori na karti](https://gridatlas.eu/?c=BA)
- [Pregled zemlje: Bosna i Hercegovina](https://gridatlas.eu/zemlja/ba/)

---

GridAtlas

- Stranica: https://gridatlas.eu/zemlja/ba/hidroelektrane/
- Podaci od 17. studenoga 2026.
- Podaci: ODbL, CC BY i dijelom CC BY-NC, uz navođenje izvora; preuzimanje u cjelini samo nekomercijalno. Kod: MIT.
- Kako citirati (APA): GridAtlas. (2026, 17. studenoga). Hidroelektrane u Bosni i Hercegovini [Skup podataka]. https://gridatlas.eu/zemlja/ba/hidroelektrane/
