3RS2 STROJARNICA
Category, existing network: no capacity · Free capacity: 0 MW
Figures
- Category, existing network
- no capacity
- Category, with upgraded 110/x kV transformer
- no capacity
- Free capacity
- 0 MW
- Added by the upgrade
- 0 MW
- Existing users
- 0 MW
- Lowest daily consumption
- 0 MW
Category across releases
| Release | Existing network | Free |
|---|---|---|
| 1 November 2026 (v6) | no capacity | 0 MW |
Source and disclaimer
Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.
State of the data: 1 November 2026 (v6).
How to cite
For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.
APA: GridAtlas. (2026, November 13). 3RS2 STROJARNICA [Data set]. https://gridatlas.eu/en/grid-capacity/3rs2-strojarnica/