Learning corner: how the power system works

Electricity cannot be kept in a warehouse like goods: at every moment exactly as much has to be generated as is being used. That makes the power system one large, constantly balanced machine that spans a whole continent.

A few minutes of reading here explain its main parts and the words the map uses. Each explanation comes with a link that opens the map on exactly that.

Guided stories on the map

A story takes you through the map step by step: the map moves by itself and shows what you are reading about. It takes a minute or two and you can stop whenever you like.

The journey of electricity in four steps

  1. Generation. A power plant turns some other energy into electricity: falling water, the heat of combustion or of a nuclear reaction, wind or sunlight.
  2. Transmission. At the plant the voltage is raised to 110, 220 or 400 kilovolts and the electricity sets off along transmission lines. High voltage keeps the losses small over long distances.
  3. Transformation. In substations the voltage is lowered step by step and the lines are joined into a network, so electricity can reach the same place from several sides.
  4. Distribution. Lower-voltage lines (35, 20 and 10 kilovolts, and finally 0.4) bring electricity to towns, businesses and homes.

Power and energy: a MW is not a MWh

Solar energy in five sentences

Why it matters when you use it

Electricity is generated at the very moment it is used. When you start the washing machine in the middle of a sunny or windy day, more of that electricity comes from sun and wind; on a winter evening, when everyone is cooking and heating, gas and coal plants work harder.

On the map, next to the date of the data, there is a coloured dot and a percentage: the share of renewable sources in what that country's plants are generating this hour. Green from 65 %, amber from 35 %, red below that.

It is the share of domestic generation, from ENTSO-E's figures. It says nothing about imports or about the price a household pays, so it is a signpost, not a bill. The figure arrives an hour or two after the hour itself; when it is more than four hours old the dot is grey.

Why electricity sometimes has a negative price

Electricity is sold on the exchange a day ahead, hour by hour. Generators offer what they can deliver and at what price, buyers what they need, and each hour gets one price at which supply and demand meet.

When the sun shines hard or the wind blows while little is used (a sunny Sunday in spring), more electricity is on offer than anyone needs. Some plants cannot be switched off for a few hours, or it does not pay to: a nuclear plant, a plant that heats a town as it generates, a run-of-river hydro plant whose water flows anyway. They would rather pay to be rid of their electricity than stop, and the price falls to zero or below.

A negative price means the seller pays the buyer. It is a wholesale price between companies: a household on an ordinary tariff pays the same in every hour and its bill does not turn negative. Those who can choose when to use electricity, or store it, gain: pumped-storage plants, batteries, charging stations, industry.

Such hours are a sign that the system needs more flexibility: storage, demand that can be moved, and lines to neighbours who need electricity at that moment.

Glossary

Installed capacity
The greatest power a plant is built for. What it actually generates is almost always less: the sun does not shine at night, the wind does not always blow, and a hydro plant depends on how much water arrives.
Voltage (kV)
The “pressure” that pushes electricity through a line, in kilovolts. For the same power a higher voltage means a smaller current and so smaller losses in the line. That is why long distances are covered at 400 and 220 kV.
Transmission line
An overhead high-voltage line on towers. On the map a line's colour is its voltage.
Transmission grid
Lines of 110 kV and above that connect plants, large substations and neighbouring countries. In Croatia it is run by the Croatian Transmission System Operator (HOPS).
Distribution grid
Lower-voltage lines that bring electricity to end users. In Croatia it is run by HEP Distribution System Operator (HEP ODS).
Substation
A place where the voltage is raised or lowered and where lines are joined and switched. The nodes of the grid.
Interconnector
A line that crosses a national border and joins two systems. Through them countries sell electricity to each other and help out when one runs short.
Transmission system operator
The company that runs the transmission grid and matches generation to demand from second to second.
Frequency (50 Hz)
The sign of the system's balance: when more is used than generated the frequency falls, and the other way round. Continental Europe runs as one synchronous system at 50 hertz.
Pumped-storage hydro plant
A hydro plant that pumps water to an upper reservoir when there is too much electricity and lets it back through the turbines when there is too little. The largest “battery” the system has today.
Renewable sources
Sources that renew themselves: water, sun, wind, biomass and the heat of the Earth (geothermal energy).
Day-ahead price
The price of electricity reached on the exchange for each hour of the next day, in euros per megawatt-hour. It changes from hour to hour with demand, wind, sun and water.
Free grid capacity
How much new power can still be connected at a given substation, according to the distribution system operator. It matters to anyone planning a plant.

Try it on the map

Each link opens the map with exactly what it describes switched on:

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 17, 2026.

APA: GridAtlas. (2026, November 17). Learning corner: how the power system works [Data set]. https://gridatlas.eu/en/learn/