Energy infrastructure: Montenegro
Montenegro has 1.45 GW of operating capacity and 2,015 km of transmission lines in operation. Operating power plants recorded on the map: 20. The figures sum what the sources record, so they are a lower bound.
Installed capacity by technology
| Technology | Operating | Under construction and planned | Power plants |
|---|---|---|---|
| Hydro | 784 MW | 542 MW | 12 |
| Pumped storage | 307 MW | 0 MW | 1 |
| Lignite | 225 MW | 0 MW | 1 |
| Wind | 118 MW | 294 MW | 6 |
| Solar | 17 MW | 2.97 GW | 24 |
| Gas | 0 MW | 840 MW | 4 |
| Other | not stated | 0 MW | 1 |
Operating lines by voltage
| Voltage | km |
|---|---|
| 380 kV and above | 483 km |
| 220–379 kV | 309 km |
| 110–219 kV | 606 km |
| Unknown | 617 km |
- Substations
- 113
- Data centres
- 0
Map
Electricity generation and prices
By kind of asset
How to cite
For publication: Source: GridAtlas (gridatlas.eu); as of November 17, 2026.
APA: GridAtlas. (2026, November 17). Energy infrastructure: Montenegro [Data set]. https://gridatlas.eu/en/country/me/