GridAtlas Regional energy map

TS 110/20kV POREČ

Category, existing network: D: more than 20 MW · Free capacity: 35 MW

Figures

Category, existing network
D: more than 20 MW
Category, with upgraded 110/x kV transformer
D: more than 20 MW
Free capacity
35 MW
Added by the upgrade
0 MW
Existing users
7.2 MW
Users with a contract
5.5 MW
Requests in progress
6.7 MW
Total connection capacity
19 MW
Lowest daily consumption
15 MW
Transformers (MVA)
40 + 40
Planned transformers (MVA)
40 + 40
Voltage ratio
110/20 kV
Distribution area
Elektroistra Pula
Location
45.25872, 13.63154
On the map
TS 110/20 kV Poreč

Substations it feeds

SubstationExisting networkFree
TS 35/10kV NOVIGRADC: up to 20 MW16 MW

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)D: more than 20 MW35 MW

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.

APA: GridAtlas. (2026, November 13). TS 110/20kV POREČ [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-20kv-porec/