TS 110/30kV 4TS 30 RESNIK

Category, existing network: D: more than 20 MW · Free capacity: 69 MW

Figures

Category, existing network
D: more than 20 MW
Category, with upgraded 110/x kV transformer
D: more than 20 MW
Free capacity
69 MW
Added by the upgrade
3 MW
Existing users
8.8 MW
Users with a contract
2.5 MW
Requests in progress
4.8 MW
Total connection capacity
16 MW
Lowest daily consumption
25 MW
Transformers (MVA)
60 + 63
Planned transformers (MVA)
63 + 63
Voltage ratio
110/30 kV
Distribution area
Elektra Zagreb
Location
45.80662, 16.08239
On the map
TS Resnik

Substations it feeds

SubstationExisting networkFree
TS 30/10kV 3TS 14 DUBRAVAC: up to 20 MW14 MW
TS 30/10kV 3TS 3 RUŽMARINKAC: up to 20 MW16 MW
3TS10 SESVETEno capacity0 MW
TS 30/10kV 3TS 10 SESVETEB: up to 10 MW5.9 MW
TS 30/10kV 3TS 114 SOBLINECB: up to 10 MW7.8 MW
TS 30/10kV 3TS 18 VOLOVČICAC: up to 20 MW13 MW
TS 30/10kV 3TS 12 ŽITNJAK 2B: up to 10 MW8.2 MW

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)D: more than 20 MW69 MW

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).