GridAtlas Regional energy map

TS 110/35/10kV ŽUPANJA 2

Category, existing network: no capacity

Figures

Category, existing network
no capacity
Category, with upgraded 110/x kV transformer
no capacity
Existing users
28 MW
Users with a contract
22 MW
Requests in progress
4.5 MW
Total connection capacity
55 MW
Lowest daily consumption
11 MW
Transformers (MVA)
40 + 40
Planned transformers (MVA)
40 + 40
Voltage ratio
110/35/10 kV
Distribution area
Elektra Vinkovci
Location
45.06578, 18.71919
On the map
TS Županja

Substations it feeds

SubstationExisting networkFree
TS 35/10kV BABINA GREDAno capacity0 MW
TS 35/10kV CERNAno capacity0 MW
TS 35/20kV DRENOVCIno capacity0 MW
RS 35 KV KOGENERACIJA ŽUPANJAno capacity0 MW
TS 35/6.3kV SLADORANAno capacity0 MW
TS 35/10kV ŽUPANJA 1no capacity0 MW

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)no capacity

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.

APA: GridAtlas. (2026, November 13). TS 110/35/10kV ŽUPANJA 2 [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35-10kv-zupanja-2/