TS 110/35/20/10kV T02 ZABOK
Category, existing network: no capacity
Figures
- Category, existing network
- no capacity
- Category, with upgraded 110/x kV transformer
- no capacity
- Existing users
- 7.6 MW
- Users with a contract
- 44 MW
- Requests in progress
- 5.7 MW
- Total connection capacity
- 57 MW
- Lowest daily consumption
- 13 MW
- Transformers (MVA)
- 40 + 40
- Planned transformers (MVA)
- 40 + 40
- Voltage ratio
- 110/35/20/10 kV
- Distribution area
- Elektra Zabok
- Location
- 46.02968, 15.91468
- On the map
- TS Zabok
Substations it feeds
| Substation | Existing network | Free |
|---|---|---|
| TS 35/10kV T11 BEDEKOVČINA | no capacity | 0 MW |
| TS 35/10kV T12 DONJA STUBICA | no capacity | 0 MW |
| TS 35/10kV T16 OROSLAVJE | no capacity | 0 MW |
| TS 35/10kV T19 TUHELJ | no capacity | 0 MW |
Category across releases
| Release | Existing network | Free |
|---|---|---|
| 1 November 2026 (v6) | no capacity |
Source and disclaimer
Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.
State of the data: 1 November 2026 (v6).