TS 110/35kV IVANIĆ
Category, existing network: no capacity
Figures
- Category, existing network
- no capacity
- Category, with upgraded 110/x kV transformer
- no capacity
- Existing users
- 19 MW
- Users with a contract
- 31 MW
- Requests in progress
- 8.7 MW
- Total connection capacity
- 59 MW
- Lowest daily consumption
- 11 MW
- Transformers (MVA)
- 40 + 40
- Planned transformers (MVA)
- 40 + 40
- Voltage ratio
- 110/35 kV
- Distribution area
- Elektra Križ
- Location
- 45.70996, 16.46464
- On the map
- TS 110/35 kV Ivanić-grad
Substations it feeds
| Substation | Existing network | Free |
|---|---|---|
| TS 35/20/10kV ČAZMA | no capacity | 0 MW |
| TS 35/10kV IVANIĆ | no capacity | 0 MW |
| TS 35/10kV KLOŠTAR | no capacity | 0 MW |
| TS 35/10kV KRIŽ | no capacity | 0 MW |
| TS 35/10kV POPOVAČA | no capacity | 0 MW |
| 3RS12 RS ŽUTICA | no capacity | 0 MW |
| TS 35/10kV ŠUMEĆANI | no capacity | 0 MW |
| TS 35/10kV ŽUTICA | no capacity | 0 MW |
Category across releases
| Release | Existing network | Free |
|---|---|---|
| 1 November 2026 (v6) | no capacity |
Source and disclaimer
Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.
State of the data: 1 November 2026 (v6).
How to cite
For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.
APA: GridAtlas. (2026, November 13). TS 110/35kV IVANIĆ [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35kv-ivanic/