GridAtlas Regional energy map

TS 110/35kV LIČKI OSIK

Category, existing network: B: up to 10 MW · Free capacity: 7.4 MW

Figures

Category, existing network
B: up to 10 MW
Category, with upgraded 110/x kV transformer
B: up to 10 MW
Free capacity
7.4 MW
Added by the upgrade
0 MW
Existing users
10 MW
Users with a contract
25 MW
Requests in progress
7.7 MW
Total connection capacity
43 MW
Lowest daily consumption
10 MW
Transformers (MVA)
40 + 40
Planned transformers (MVA)
40 + 40
Voltage ratio
110/35 kV
Distribution area
Elektrolika Gospić
Location
44.60094, 15.43457
On the map
TS Lički Osik

Substations it feeds

SubstationExisting networkFree
TS 35/10kV BUNIĆA: up to 5 MW2.5 MW
TS 35/10kV DONJI LAPACA: up to 5 MW2.5 MW
TS 35/10kV GOSPIĆB: up to 10 MW7.1 MW
TS 35/10kV KORENICAA: up to 5 MW4 MW
TS 35/10kV LIČKI OSIKA: up to 5 MW2.5 MW
TS 35/10kV LIČKO PETROVO SELOA: up to 5 MW2.5 MW
TS 35/10kV PERUŠIĆA: up to 5 MW2.4 MW
TS 35/10kV PLITVICEA: up to 5 MW2.2 MW
TS 35/10kV RASTOVAČAA: up to 5 MW4 MW
TS 35/20kV SMILJANA: up to 5 MW2 MW
TS 35/10kV UDBINAA: up to 5 MW1.4 MW

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)B: up to 10 MW7.4 MW

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.

APA: GridAtlas. (2026, November 13). TS 110/35kV LIČKI OSIK [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35kv-licki-osik/