TS 110/35kV OPUZEN

Category, existing network: D: more than 20 MW · Free capacity: 28 MW

Figures

Category, existing network
D: more than 20 MW
Category, with upgraded 110/x kV transformer
D: more than 20 MW
Free capacity
28 MW
Added by the upgrade
0 MW
Existing users
3 MW
Users with a contract
13 MW
Requests in progress
0.9 MW
Total connection capacity
17 MW
Lowest daily consumption
5 MW
Transformers (MVA)
40 + 40
Planned transformers (MVA)
40 + 40
Voltage ratio
110/35 kV
Distribution area
Elektrodalmacija Split
Location
43.01958, 17.57270
On the map
TS Opuzen

Substations it feeds

SubstationExisting networkFree
TS 35/10kV BRISTB: up to 10 MW8 MW
TS 35/10kV METKOVIĆ 1B: up to 10 MW7.1 MW
TS 35/10kV METKOVIĆ 2A: up to 5 MW2 MW
TS 35/10kV OPUZENA: up to 5 MW1.7 MW
TS 35/10kV VRANJAKB: up to 10 MW8 MW

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)D: more than 20 MW28 MW

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.

APA: GridAtlas. (2026, November 13). TS 110/35kV OPUZEN [Data set]. https://gridatlas.eu/en/grid-capacity/ts-110-35kv-opuzen/