TS 220/110/30kV BILICE
Category, existing network: D: more than 20 MW · Free capacity: 75 MW
Figures
- Category, existing network
- D: more than 20 MW
- Category, with upgraded 110/x kV transformer
- D: more than 20 MW
- Free capacity
- 75 MW
- Added by the upgrade
- 0 MW
- Existing users
- 45 MW
- Users with a contract
- 28 MW
- Requests in progress
- 3.8 MW
- Total connection capacity
- 78 MW
- Lowest daily consumption
- 26 MW
- Transformers (MVA)
- 63 + 63 + 63
- Planned transformers (MVA)
- 63 + 63 + 63
- Voltage ratio
- 220/110/30 kV
- Distribution area
- Elektra Šibenik
- Location
- 43.75590, 15.90444
- On the map
- TS Bilice
Substations it feeds
| Substation | Existing network | Free |
|---|---|---|
| TS 30/10/6.3kV LOZOVAC | no capacity | 0 MW |
| TS 30/10kV PODI | no capacity | 0 MW |
| TS 30/10kV PRIMOŠTEN | A: up to 5 MW | 3.4 MW |
| TS 30/10kV ROGOZNICA | A: up to 5 MW | 0.7 MW |
| 3RS18 RS 30 kV VE ORLICE | no capacity | 0 MW |
| TS 30/10kV ŠIBENIK 1 | C: up to 20 MW | 15 MW |
| TS 30/10kV ŠIBENIK 3 | C: up to 20 MW | 10 MW |
| TS 30/10kV VODICE | C: up to 20 MW | 14 MW |
Category across releases
| Release | Existing network | Free |
|---|---|---|
| 1 November 2026 (v6) | D: more than 20 MW | 75 MW |
Source and disclaimer
Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.
State of the data: 1 November 2026 (v6).
How to cite
For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.
APA: GridAtlas. (2026, November 13). TS 220/110/30kV BILICE [Data set]. https://gridatlas.eu/en/grid-capacity/ts-220-110-30kv-bilice/