TS 30/10kV 3TS 5 JAGODNJAK
Category, existing network: B: up to 10 MW · Free capacity: 8 MW
Figures
- Category, existing network
- B: up to 10 MW
- Category, with upgraded 110/x kV transformer
- B: up to 10 MW
- Free capacity
- 8 MW
- Added by the upgrade
- 0 MW
- Existing users
- 0 MW
- Lowest daily consumption
- 0 MW
- Transformers (MVA)
- 8
- Planned transformers (MVA)
- 8
- Voltage ratio
- 30/10 kV
- Distribution area
- Elektra Zagreb
- Fed by
- TS 110/30kV 4TS 28 TE-TO
- Location
- 45.82663, 15.98591
Category across releases
| Release | Existing network | Free |
|---|---|---|
| 1 November 2026 (v6) | B: up to 10 MW | 8 MW |
Source and disclaimer
Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.
State of the data: 1 November 2026 (v6).