GridAtlas Regional energy map

TS 30/10kV 3TS 6 DRŽIĆEVA

Category, existing network: B: up to 10 MW · Free capacity: 7.9 MW

Figures

Category, existing network
B: up to 10 MW
Category, with upgraded 110/x kV transformer
B: up to 10 MW
Free capacity
7.9 MW
Added by the upgrade
0 MW
Existing users
0.1 MW
Users with a contract
0 MW
Requests in progress
0 MW
Total connection capacity
0.1 MW
Lowest daily consumption
0 MW
Transformers (MVA)
8 + 8
Planned transformers (MVA)
8 + 8
Voltage ratio
30/10 kV
Distribution area
Elektra Zagreb
Fed by
TS 110/30kV 4TS 28 TE-TO
Location
45.80014, 15.99429

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)B: up to 10 MW7.9 MW

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.

APA: GridAtlas. (2026, November 13). TS 30/10kV 3TS 6 DRŽIĆEVA [Data set]. https://gridatlas.eu/en/grid-capacity/ts-30-10kv-3ts-6-drziceva/