GridAtlas Regional energy map

TS 35/20kV TUNEL SVETI ROK

Category, existing network: A: up to 5 MW · Free capacity: 1.5 MW

Figures

Category, existing network
A: up to 5 MW
Category, with upgraded 110/x kV transformer
B: up to 10 MW
Free capacity
1.5 MW
Added by the upgrade
6.5 MW
Existing users
0 MW
Lowest daily consumption
0 MW
Transformers (MVA)
8 + 8
Planned transformers (MVA)
8 + 8
Voltage ratio
35/20 kV
Distribution area
Elektrolika Gospić
Fed by
TS 110/35/10kV GRAČAC 2 (DOIĆI)
Location
44.30600, 15.67988

Category across releases

ReleaseExisting networkFree
1 November 2026 (v6)A: up to 5 MW1.5 MW

Source and disclaimer

Source: HEP ODS, kapaciteti.hep.hr, reused with HEP ODS's permission. HEP ODS keeps the information as current as it can but cannot guarantee it is timely or accurate when a connection request (EOTRP) is filed; the data is for information only and guarantees no connection. A category is a band, and the free capacity of a 35/x kV substation is also limited by the substation above it, so capacities are never added up.

State of the data: 1 November 2026 (v6).

How to cite

For publication: Source: GridAtlas (gridatlas.eu); as of November 13, 2026.

APA: GridAtlas. (2026, November 13). TS 35/20kV TUNEL SVETI ROK [Data set]. https://gridatlas.eu/en/grid-capacity/ts-35-20kv-tunel-sveti-rok/